WCTC Wind Turbine



Location: Pewaukee, WI
Project Manager: Christopher Kneeland
Project Foreman: Jon Olson
General Contractor: Venture Electric
Size: 10 kW; ~95 foot tall
Completion Date: November 2010

Project Description:
Installation of a 10 kW wind turbine generator at the Waukesha County Technical College. The turbine was manufactured by the Burgey Company and was mounted on a custom 95 foot tall tower. The concrete base is 12'x12' and 6' thick. The annual production is about 12,500 kWh.

The installation site is within two miles of an airport and required a great deal of coordination with the local authorities and the FAA. Providing all of the appropriate documentation, continuous verification of all measurements, and effective communication ensured the project was installed as planned, on time, and on budget.